About FDC
Powerful, fast + affordable solutions
Discover the FDCServers story. Who we are, where we've been, and why we're different.

Founded
in 2002
FDC Servers set out with a visionary aim: to offer competitively priced hosting solutions that provide substantial connectivity for all types of data.
From the start, we pioneered the industry with month-to-month services featuring unmetered bandwidth and were among the first to offer servers equipped with 1Gbps, 10Gbps, and 100Gbps port connections. Today, our mission remains unchanged. To continue to deliver high performance, top-tier bandwidth offerings at worldwide locations, designed to meet the complex demands of the modern digital ecosystem.
Our Story
Follow our evolutionary path as we detail the significant milestones and expansions that have defined FDCs journey.
2002

FDCServers launches in Chicago, providing bare metal servers and colocation, pioneering unmetered 100Mbps and 1Gbps connections.
2003

FDCServers LLC is officially established, strengthening its role as a provider of reliable, high-bandwidth hosting solutions.
2005

FDCServers expands its offerings with Virtual Private Servers (VPS), broadening high-performance hosting options.
2009

A new data center opens in Denver, Colorado, enhancing connectivity options within the US.
2011

European expansion begins with bare metal servers and VPS launched in Czechia, broadening international service availability.
2012

Amsterdam and Vienna locations added; introduces unmetered 10Gbps connections and a Content Delivery Network (CDN).
2013

US network significantly expands with data centers in Los Angeles, Seattle, New York, and Miami, increasing national coverage.
2014

European footprint grows further with new locations in Paris, London, and Frankfurt, enhancing international hosting capabilities.
2016

Toronto, Canada data center opens, highlighting continued North American expansion and commitment to global service delivery.
2017

Asian market entry with new data centers in Hong Kong, Singapore, and Tokyo, bringing affordable high-bandwidth services regionally.
2018

100Gbps connectivity launched, reinforcing leadership in ultra-high-performance hosting solutions.
2019
New location opened in Kyiv, Ukraine, enhancing European connectivity options and hosting capabilities.
2021

New locations added in Lima, Santiago, Fortaleza, Buenos Aires, and Moscow, while successfully testing 300Gbps and 400Gbps connections.
2023

Instant deployment launched for bare metal servers and metered bandwidth options, enhancing flexibility and scalability globally.
2024

Services expand into top-tier Equinix data centers with 400Gbps servers and multi-homed IP transit at 400Gbps and 800Gbps.
2025

Upgraded EPYC and NVMe-based VPS products launched, setting new benchmarks in server performance with ongoing innovation planned.
Why fdc
Reasons to choose FDC

iperf3 Tutorial: Test Network Speed on Linux & Windows
Install iperf3, run bandwidth tests, and tune TCP buffers for accurate results on Linux and Windows. Covers UDP, bidirectional, and 10GbE+ testing
10 min read - May 7, 2026

Have questions or need a custom solution?
Flexible options
Global reach
Instant deployment
Flexible options
Global reach
Instant deployment





